Showing posts with label Sukhoi T-50. Show all posts
Showing posts with label Sukhoi T-50. Show all posts

Monday, March 14, 2011

Sukhoi T-50 (wallpaper 4)

Sukhoi T-50 Wallpaper 4size image : 1200 x 749
Sukhoi T-50 (wallpaper 4)
Sukhoi T-50 aircraft images wallpaper gallery 4. Sukhoi T-50 aircraft pictures collection 4.
According to Sukhoi, the new radar will reduce pilot load and the aircraft will have a new data link to share information between aircraft. Composites are used extensively on the T-50 and comprise 25% of its weight and almost 70% of the outer surface. It is estimated that titanium alloy content of the fuselage is 75%. Sukhoi's concern for minimizing radar cross-section (RCS) and drag is also shown by the provision of two tandem main weapons bays in the centre fuselage, between the engine nacelles. Each is estimated to be between 4.9-5.1 m long. The main bays are augmented by bulged, triangular-section bays at the wing root.
Sukhoi T-50 (wallpaper 4)
Sukhoi T-50 aircraft images wallpaper gallery 4. Sukhoi T-50 aircraft pictures collection 4.
The Moskovsky Komsomolets reported that the T-50 has been designed to be more maneuverable than the F-22 Raptor at the cost of making it less stealthy than the F-22. One of the design elements that have such an effect is the Leading Edge Vortex Controller (LEVCON). The PAK-FA SH121 radar complex includes three X-Band AESA radars located on the front and sides of the aircraft. These will be accompanied by L-Band radars on the wing leading edges. L-Band radars are proven to have increased effectiveness against very low observable (VLO) targets which are optimized only against X-Band frequencies, but their longer wavelengths reduce their resolution. The PAK-FA will feature an IRST optical/IR search and tracking system, based on the OLS-35M which is currently in service with the Su-35S. Hindustan Aeronautics Limited will reportedly provide the navigation system and the mission computer,
Sukhoi T-50 (wallpaper 4)
Sukhoi T-50 aircraft images wallpaper gallery 4. Sukhoi T-50 aircraft pictures collection 4.

Sukhoi T-50 (wallpaper 3)

Sukhoi T-50 Wallpaper 3size image : 1200 x 749
Sukhoi T-50 (wallpaper 3)
Sukhoi T-50 aircraft images wallpaper gallery 3. Sukhoi T-50 aircraft pictures collection 3.
On 28 February 2009, Mikhail Pogosyan announced that the airframe for the aircraft was almost finished and that the first prototype should be ready by August 2009. On 20 August 2009, Sukhoi General Director Mikhail Pogosyan said that the first flight would be by year end. Konstantin Makiyenko, deputy head of the Moscow-based Centre for Analysis of Strategies and Technologies said that "even with delays", the aircraft would likely make its first flight by January or February, adding that it would take 5 to 10 years for commercial production.
Sukhoi T-50 (wallpaper 3)
Sukhoi T-50 aircraft images wallpaper gallery 3. Sukhoi T-50 aircraft pictures collection 3.
The maiden flight had been repeatedly postponed since early 2007 as the T-50 encountered unspecified technical problems. Air Force chief Alexander Zelin admitted as recently as August 2009 that problems with the engine and in technical research remained unsolved. On 8 December 2009, Deputy Prime Minister Sergei Ivanov announced that the first trials with the fifth-generation aircraft would begin in 2010. The testing, however, has commenced earlier than stated, with the first successful taxiing test taking place on 24 December 2009. The aircraft's maiden flight took place on 29 January 2010 at KnAAPO's Komsomolsk-on-Amur Dzemgi Airport; the aircraft was piloted by Sergey Bogdan (Сергей Богдан) and the flight lasted for 47 minutes.
Sukhoi T-50 (wallpaper 3)
Sukhoi T-50 aircraft images wallpaper gallery 3. Sukhoi T-50 aircraft pictures collection 3.

Sukhoi T-50 (wallpaper 2)

Sukhoi T-50 Wallpaper 2size image : 1200 x 749
Sukhoi T-50 (wallpaper 2)
Sukhoi T-50 aircraft images wallpaper gallery 2. Sukhoi T-50 aircraft pictures collection 2.
In the late 1980s, the Soviet Union outlined a need for a next-generation aircraft to replace its MiG-29 and Su-27 in frontline service. Two projects were proposed to meet this need, the Sukhoi Su-47 and the Mikoyan Project 1.44. In 2002, Sukhoi was chosen to lead the design for the new combat aircraft. The Tekhnokompleks Scientific and Production Center, Ramenskoye Instrument Building Design Bureau, the Tikhomirov Scientific Research Institute of Instrument Design, the Ural Optical and Mechanical Plant (Yekaterinburg), the Polet firm (Nizhniy Novgorod) and the Central Scientific Research Radio Engineering Institute (Moscow) were pronounced winners in the competition held in the beginning of 2003 for the development of the avionics suite for the fifth-generation airplane.
Sukhoi T-50 (wallpaper 2)
Sukhoi T-50 aircraft images wallpaper gallery 2. Sukhoi T-50 aircraft pictures collection 2.
NPO Saturn has been determined the lead executor for work on the engines for this airplane. The Novosibirsk Chkalov Aviation Production Association (NAPO Chkalov) has begun construction of the fifth-generation multirole fighter. This work is being performed at Komsomol'sk-on-Amur together with Komsomolsk-on-Amur Aircraft Production Association; the enterprise's general director, Fedor Zhdanov reported during a visit to NAPO by Novosibirsk Oblast's governor Viktor Tolokonskiy on 6 March 2007. "Final assembly will take place at Komsomol'sk-on-Amur, and we will be carrying out assembly of the fore body of this airplane", Zhdanov specified.
Sukhoi T-50 (wallpaper 2)
Sukhoi T-50 aircraft images wallpaper gallery 2. Sukhoi T-50 aircraft pictures collection 2.

Sukhoi T-50

Sukhoi T-50 Wallpaper 1size image : 1200 x 749
Sukhoi T-50 (wallpaper 1)
Sukhoi T-50 aircraft images wallpaper gallery 1. Sukhoi T-50 aircraft pictures collection 1.
The Sukhoi PAK FA (Russian: Перспективный авиационный комплекс фронтовой авиации, Perspektivny aviatsionny kompleks frontovoy aviatsii, literally "Prospective Airborne Complex - Frontline Aviation") is a twin-engine jet fighter being developed by Sukhoi OKB for the Russian Air Force. The current prototype is Sukhoi's T-50. The PAK FA, when fully developed, is intended to be the successor to the MiG-29 and Su-27 in the Russian inventory and serve as the basis of the Sukhoi/HAL FGFA project being developed with India. A fifth generation jet fighter, the T-50 performed its first flight 29 January 2010. Its second flight was on 6 February and its third on 12 February 2010. As of 31 August 2010, it had made 17 flights and by mid-November, 40 in total. The second prototype was to start its flight test by the end of 2010, but this was delayed until March 2011.
Sukhoi T-50 (wallpaper 1)
Sukhoi T-50 aircraft images wallpaper gallery 1. Sukhoi T-50 aircraft pictures collection 1.
Sukhoi director Mikhail Pogosyan has projected a market for 1,000 aircraft over the next four decades, which will be produced in a joint venture with India, two hundred each for Russia and India and six hundred for other countries. He has also said that the Indian contribution would be in the form of joint work under the current agreement rather than as a joint venture. The Indian Air Force will "acquire 50 single-seater fighters of the Russian version" before the two seat FGFA is developed. The Russian Defense Ministry will purchase the first 10 aircraft after 2012 and then 60 after 2016. The first batch of fighters will be delivered without the "Fifth generation" engines. Ruslan Pukhov, director of the Centre for Analysis of Strategies and Technologies, has projected that Vietnam will be the second export customer for the fighter. The PAK-FA is expected to have a service life of about 30–35 years.
Sukhoi T-50 (wallpaper 1)
Sukhoi T-50 aircraft images wallpaper gallery 1. Sukhoi T-50 aircraft pictures collection 1.

LinkWithin